Difference between revisions of "Load Shedding"
Jump to navigation
Jump to search
m |
|||
Line 3: | Line 3: | ||
==== [[ENTSO-E]] ==== | ==== [[ENTSO-E]] ==== | ||
{{definition|Load-Shedding is the disconnection of load from the synchronous electric [[System]], usually performed automatically, to control the system frequency in emergency situations. <ref>[https://emr.entsoe.eu/glossary/bin/view/ENTSO-E+Common+Glossary/Load-Shedding ENSTSO-E]</ref>}} | {{definition|Load-Shedding is the disconnection of load from the synchronous electric [[System]], usually performed automatically, to control the system frequency in emergency situations. <ref>[https://emr.entsoe.eu/glossary/bin/view/ENTSO-E+Common+Glossary/Load-Shedding ENSTSO-E]</ref>}} | ||
− | + | <br/> | |
=== National Definitions === | === National Definitions === | ||
==== [[South Africa]] ==== | ==== [[South Africa]] ==== | ||
− | {{definition|Load Shedding, or load reduction, is a controlled countrywide option to respond to unplanned [[Event|events]] to protect the electricity power system from a total [[blackout]]. <ref>[http://loadshedding.eskom.co.za/LoadShedding/Description | + | {{definition|Load Shedding, or load reduction, is a controlled countrywide option to respond to unplanned [[Event|events]] to protect the electricity power system from a total [[blackout]]. <ref>[http://loadshedding.eskom.co.za/LoadShedding/Description ESCOM]</ref>}} |
<!-- | <!-- |
Revision as of 00:16, 14 May 2016
Contents
Definitions
European Definitions
ENTSO-E
Load-Shedding is the disconnection of load from the synchronous electric System, usually performed automatically, to control the system frequency in emergency situations. [1]
National Definitions
South Africa
Load Shedding, or load reduction, is a controlled countrywide option to respond to unplanned events to protect the electricity power system from a total blackout. [2]