Emission Rights Procedure: Unterschied zwischen den Versionen

Aus Cometh-Wiki
Zur Navigation springen Zur Suche springen
Zeile 7: Zeile 7:
 
3 criteria must be examined.
 
3 criteria must be examined.
  
- Greenhouse gas emissions are avoided
+
* Greenhouse gas emissions are avoided
  
- The financial additionality is fulfilled
+
- The financial additionality is fulfilled
  
- Is a methodology for the project type available
+
- Is a methodology for the project type available
  
  

Version vom 2. Mai 2012, 15:41 Uhr

The emissions right procedure contains 7 steps.

1 Project check

Project check means: determine whether the project meets the conditions for an emissions project.

3 criteria must be examined.

  • Greenhouse gas emissions are avoided

- The financial additionality is fulfilled

- Is a methodology for the project type available


2 Project design document

3 Validation of the project by a DNA

4 Letter or Approval

5 Final determination

6 Project registration

7 Verification of emissions reductions