Hauptseite: Unterschied zwischen den Versionen

Aus Cometh-Wiki
Zur Navigation springen Zur Suche springen
(Decision guidance for utilisation of CMM)
Zeile 21: Zeile 21:
 
# Concept for CMM utilisation with production of LNG for antural gas replacement (WP3)
 
# Concept for CMM utilisation with production of LNG for antural gas replacement (WP3)
 
# Optimising and development of CMM utilisations of methane from ventilation air at a location in Russia (WP5)
 
# Optimising and development of CMM utilisations of methane from ventilation air at a location in Russia (WP5)
 +
 +
The big variety of market instruments and the differnt conditions were collected and evaluated in WP1. These results will give an overview of financial and legal aspects.  The technical backround information presented in this Wiki were researched and developed in WP2. The practical experiences with CMM utilisation projects were provided by WP3 and WP5. So this Wiki should help to identify the best technical solution and project constellation for the local conditions.
  
  
  
One prerequisite for a CMM-Project is a operating or abandoned coal mine that generates CMM.
 
  
  

Version vom 21. September 2011, 16:28 Uhr

Decision guidance for utilisation of CMM

This Wiki will support you with your challenges according to CMM-projects taken into account issues of

It is part of the project "Coal Mine Methane - New Solutions for Use of CMM - Reduction of GHG emissions (CoMeth)". The project, fundend by the EU, is conducted in close co-operation of eight project partners from different countries: Germany, Poland, Russia, Ukraine, Kazakhstan and the UK.

Therefor, the Wiki will look at the specific conditions of these countries in more detail and will provide the reader with specific country information.

The basis of the presented content is developed in four former or ongoing workpackages:

  1. Basics on country conditions (WP1)
  2. Basics on thecnologies for utilisation of CMM (WP2)
  3. Concept for CMM utilisation with production of LNG for antural gas replacement (WP3)
  4. Optimising and development of CMM utilisations of methane from ventilation air at a location in Russia (WP5)

The big variety of market instruments and the differnt conditions were collected and evaluated in WP1. These results will give an overview of financial and legal aspects. The technical backround information presented in this Wiki were researched and developed in WP2. The practical experiences with CMM utilisation projects were provided by WP3 and WP5. So this Wiki should help to identify the best technical solution and project constellation for the local conditions.




MediaWiki wurde erfolgreich installiert.

Hilfe zur Benutzung und Konfiguration der Wiki-Software findest du im Benutzerhandbuch.

Starthilfen