Emission Rights Procedure: Unterschied zwischen den Versionen

Aus Cometh-Wiki
Zur Navigation springen Zur Suche springen
Zeile 1: Zeile 1:
 
The emissions right procedure contains 7 steps.
 
The emissions right procedure contains 7 steps.
  
1 Project check
+
== 1 Project check==
  
2 Project design document
+
Project check means: determine whether the project meets the conditions for an emissions project.
  
3 Validation of the project by a DNA
+
3 criteria must be examined.
  
4 Letter or Approval
+
- Greenhouse gas emissions are avoided
  
5 Final determination
+
- The financial additionality is fulfilled
  
6 Project registration
+
- Is a methodology for the project type available
  
7 Verification of emissions reductions
+
 
 +
== 2 Project design document ==
 +
 
 +
== 3 Validation of the project by a DNA ==
 +
 
 +
== 4 Letter or Approval ==
 +
 
 +
== 5 Final determination ==
 +
 
 +
== 6 Project registration ==
 +
 
 +
== 7 Verification of emissions reductions ==

Version vom 2. Mai 2012, 15:41 Uhr

The emissions right procedure contains 7 steps.

1 Project check

Project check means: determine whether the project meets the conditions for an emissions project.

3 criteria must be examined.

- Greenhouse gas emissions are avoided
- The financial additionality is fulfilled
- Is a methodology for the project type available


2 Project design document

3 Validation of the project by a DNA

4 Letter or Approval

5 Final determination

6 Project registration

7 Verification of emissions reductions