Technical Procedure: Unterschied zwischen den Versionen
Zur Navigation springen
Zur Suche springen
(→Technical procedure for porject design and construction) |
(→Technical procedure for porject design and construction) |
||
| Zeile 3: | Zeile 3: | ||
After the idea for the project was created, the technical conditions have to be checked at the mine. Special feature have to be observed: | After the idea for the project was created, the technical conditions have to be checked at the mine. Special feature have to be observed: | ||
| − | - CMM Quality | + | - '''CMM Quality''' |
| − | differend sources of methane [[quality of CMM]] produce CMM with differend methane content. | + | differend sources of methane [[quality of CMM]] produce CMM with differend methane content. The quality of CMM is an important fact for the kind of utilisation. |
Version vom 7. März 2012, 16:05 Uhr
Technical procedure for porject design and construction
After the idea for the project was created, the technical conditions have to be checked at the mine. Special feature have to be observed:
- CMM Quality
differend sources of methane quality of CMM produce CMM with differend methane content. The quality of CMM is an important fact for the kind of utilisation.
- Amount of CMM
- Availability of CMM
- Existing extraction systems
- Any demand for electricity and heat on the mine
- surplus methane (The surplus of CMM can be burned without energy recovery to reduce greenhouse gas emissions)