- CMM Quality
 
- CMM Quality
  
differend sources of methane   
+
differend sources of methane  [[quality of CMM]] produce CMM with differend methane content.
  
  

Version vom 7. März 2012, 15:37 Uhr

Technical procedure for porject design and construction

After the idea for the project was created, the technical conditions have to be checked at the mine. Special feature have to be observed:

- CMM Quality

differend sources of methane quality of CMM produce CMM with differend methane content.


- Amount of CMM

- Availability of CMM

- Existing extraction systems

- Any demand for electricity and heat on the mine

- surplus methane (The surplus of CMM can be burned without energy recovery to reduce greenhouse gas emissions)