Approval procedure: Unterschied zwischen den Versionen

Aus Cometh-Wiki
Zur Navigation springen Zur Suche springen
(Third party as Operator)
(Third party as Operator)
Zeile 22: Zeile 22:
  
 
- interruption of coal producting by technical faults
 
- interruption of coal producting by technical faults
 +
 +
 +
 +
Selling of products
 +
 +
The products of the utilisation shall be sold to the customer. Considering the situation the planted delivery date can be changed because of missing fuel. So all these factor has to be kept in mind by constructing a CMM project.

Version vom 6. März 2012, 17:32 Uhr

Approval procedure

The approval procedure to start a CMM utilisation project must be regarded from 2 main positions.

1) The mine owner operats the utilisation plant

2) A third party operats the utilisation plant

Mine owner operats utlisation plant

In this case the mine produce the CMM and utilised it. The products heat and power will be consumed by the mime itself. So there will be no real contracting problem to feeding of fuel and for the consumption of products.

Third party as Operator

Fuel supply

In this case the utilised CMM would be produced by a mine near by. So there mus be a contract about delivery of CMM to the utilisation installation. Specially for CMM there could not be a garanty for quantity and quality of the gas. The quality depence on the mining situation of the mine. There a big influences by:

- gas content in the digged coal

- Quantity of coal production

- market for coal

- interruption of coal producting by technical faults


Selling of products

The products of the utilisation shall be sold to the customer. Considering the situation the planted delivery date can be changed because of missing fuel. So all these factor has to be kept in mind by constructing a CMM project.