Approval procedure: Unterschied zwischen den Versionen
Zur Navigation springen
Zur Suche springen
(→Approval procedure) |
(→Mine owner operats utlisation plant) |
||
| Zeile 7: | Zeile 7: | ||
== Mine owner operats utlisation plant == | == Mine owner operats utlisation plant == | ||
| − | In this case.. | + | In this case the mine produce the CMM and utilised it. The products heat and power will be consumed by the mime itself. So there will be no real contracting problem to feeding of fuel and for the consumption of products. |
== Third party as Operator == | == Third party as Operator == | ||
In this case ths utilised CMM would be produced by a mine near by. | In this case ths utilised CMM would be produced by a mine near by. | ||
Version vom 6. März 2012, 17:16 Uhr
Approval procedure
The approval procedure to start a CMM utilisation project must be regarded from 2 main positions.
1) The mine owner operats the utilisation plant
2) A third party operats the utilisation plant
Mine owner operats utlisation plant
In this case the mine produce the CMM and utilised it. The products heat and power will be consumed by the mime itself. So there will be no real contracting problem to feeding of fuel and for the consumption of products.
Third party as Operator
In this case ths utilised CMM would be produced by a mine near by.