Difference between revisions of "Risk Estimation"
Jump to navigation
Jump to search
Line 10: | Line 10: | ||
==== [[Australia]] ==== | ==== [[Australia]] ==== | ||
{{definition| Risk estimation is the process used to produce a measure of the level of risks being analysed. <ref name="MAIMAus">[https://www.em.gov.au/Documents/Manual03-AEMGlossary.PDF Australian Emergency Management Glossary, Emergency Management Australia (1998)]</ref>}} | {{definition| Risk estimation is the process used to produce a measure of the level of risks being analysed. <ref name="MAIMAus">[https://www.em.gov.au/Documents/Manual03-AEMGlossary.PDF Australian Emergency Management Glossary, Emergency Management Australia (1998)]</ref>}} | ||
− | Risk estimation consists of the following steps: frequency analysis,[[consequence]] analysis and their integration.<br /> | + | Risk estimation consists of the following steps: frequency analysis,[[consequence]] analysis and their integration.<br /><br/> |
− | + | ==== [[Finland]] ==== | |
+ | {{definition|Risk estimation is a part of [[Risk Analysis]] in which the level of [[risk|risks]] is determined.<br/><br/>Riskin suuruuden arviointi: Riskianalyysin osa, jossa määritetään riskien taso. <ref name="finland">[Palo- ja pelastussanasto. Helsinki: Suomen Pelastusalan Keskusjärjestö ry ja Suomen Palopäällystöliitto, 2006. 350 s. (TSK 33.) ISBN 951-797-215-6; Fire and Rescue Vocabulary. Helsinki: the Finnish National Rescue Association SPEK and the Finnish Association of Fire Chiefs, 2006. 350 p. (TSK 33.) ISBN 951-797-215-6 (In Finnish.)]</ref>}}<br /> | ||
===Standard Definition=== | ===Standard Definition=== | ||
Line 30: | Line 31: | ||
[[Category:Risk]] | [[Category:Risk]] | ||
− | {{#set:defined by=ENISA|defined by=Australia}} | + | {{#set:defined by=ENISA|defined by=Australia|defined by=Finland}} |
Revision as of 20:18, 22 February 2016
Contents
Definitions
European Definitions
ENISA
{{definition|Risk Estimation is a process used to assign values to the probability and consequences of a [[risk] (refers to ISO/IEC Guide 73). [1]}}
Other International Definitions
National Definitions
Australia
Risk estimation is the process used to produce a measure of the level of risks being analysed. [2]
Risk estimation consists of the following steps: frequency analysis,consequence analysis and their integration.
Finland
Risk estimation is a part of Risk Analysis in which the level of risks is determined.
Riskin suuruuden arviointi: Riskianalyysin osa, jossa määritetään riskien taso. [3]
Riskin suuruuden arviointi: Riskianalyysin osa, jossa määritetään riskien taso. [3]
Standard Definition
See also
Notes
- ↑ ENISA Risk Glossary
- ↑ Australian Emergency Management Glossary, Emergency Management Australia (1998)
- ↑ [Palo- ja pelastussanasto. Helsinki: Suomen Pelastusalan Keskusjärjestö ry ja Suomen Palopäällystöliitto, 2006. 350 s. (TSK 33.) ISBN 951-797-215-6; Fire and Rescue Vocabulary. Helsinki: the Finnish National Rescue Association SPEK and the Finnish Association of Fire Chiefs, 2006. 350 p. (TSK 33.) ISBN 951-797-215-6 (In Finnish.)]