Difference between revisions of "Risk Estimation"

From CIPedia
Jump to navigation Jump to search
Line 1: Line 1:
 
==Definitions==
 
==Definitions==
 
=== European Definitions ===
 
=== European Definitions ===
 
+
====[[ENISA]]====
 +
{{definition|Risk Estimation is a process used to assign values to the [[probability]] and [[Consequence|consequences]] of a [[risk] (refers to [[ISO|ISO/IEC Guide 73]]). <ref name="ENISAGlos"> [http://www.enisa.europa.eu/activities/risk-management/current-risk/risk-management-inventory/glossary ENISA Risk Glossary]</ref>}}<br />
  
 
=== Other International Definitions ===
 
=== Other International Definitions ===
Line 29: Line 30:
  
 
[[Category:Risk]]
 
[[Category:Risk]]
{{#set:defined by=Australia}}
+
{{#set:defined by=ENISA|defined by=Australia}}

Revision as of 23:34, 20 July 2015

Definitions

European Definitions

ENISA

{{definition|Risk Estimation is a process used to assign values to the probability and consequences of a [[risk] (refers to ISO/IEC Guide 73). [1]}}

Other International Definitions

National Definitions

Australia

Risk estimation is the process used to produce a measure of the level of risks being analysed. [2]

Risk estimation consists of the following steps: frequency analysis,consequence analysis and their integration.

Standard Definition

See also

Notes