Difference between revisions of "Risk Estimation"

From CIPedia
Jump to navigation Jump to search
Line 7: Line 7:
  
 
=== National Definitions ===
 
=== National Definitions ===
==== Australia ====  
+
==== [[Australia]] ====  
 
{{definition| Risk estimation is the process used to produce a measure of the level of risks being analysed.  <ref name="MAIMAus">[https://www.em.gov.au/Documents/Manual03-AEMGlossary.PDF Australian Emergency Management Glossary, Emergency Management Australia (1998)]</ref>}}
 
{{definition| Risk estimation is the process used to produce a measure of the level of risks being analysed.  <ref name="MAIMAus">[https://www.em.gov.au/Documents/Manual03-AEMGlossary.PDF Australian Emergency Management Glossary, Emergency Management Australia (1998)]</ref>}}
 
Risk estimation consists of the following steps: frequency analysis,[[consequence]] analysis and their integration.<br />
 
Risk estimation consists of the following steps: frequency analysis,[[consequence]] analysis and their integration.<br />

Revision as of 00:46, 19 July 2015

Definitions

European Definitions

Other International Definitions

National Definitions

Australia

Risk estimation is the process used to produce a measure of the level of risks being analysed. [1]

Risk estimation consists of the following steps: frequency analysis,consequence analysis and their integration.

Standard Definition

See also

Notes