Difference between revisions of "Load Shedding"
Jump to navigation
Jump to search
(→South Africa) |
(→South Africa) |
||
Line 6: | Line 6: | ||
=== National Definitions === | === National Definitions === | ||
==== [[South Africa]] ==== | ==== [[South Africa]] ==== | ||
− | {{definition|Load Shedding, or load reduction, is a controlled countrywide option to respond to unplanned [[Event|events]] to protect the electricity power system from a total [[blackout]]. <ref>[http://loadshedding.eskom.co.za/LoadShedding/Description ESCOM]</ref>}} | + | {{definition|Load Shedding, or load reduction, is a controlled countrywide option to respond to unplanned [[Event|events]] to protect the electricity power system from a total [[blackout]]. <ref>[http://loadshedding.eskom.co.za/LoadShedding/Description ESCOM]</ref>}} |
<!-- | <!-- |
Revision as of 00:17, 27 November 2017
Contents
Definitions
European Definitions
ENTSO-E
Load-Shedding is the disconnection of load from the synchronous electric system, usually performed automatically, to control the system frequency in emergency situations. [1]
National Definitions
South Africa
Load Shedding, or load reduction, is a controlled countrywide option to respond to unplanned events to protect the electricity power system from a total blackout. [2]